Nanjing,China
+86-13813931455(WhatsApp)

Category: English

HICLOVER Solution for Fighting COVID-19, with ISO9001/CE Certification.

new hospital waste treatment plant

We are in the process of building a new hospital waste treatment plant and we are evaluating different technologies from around the world.  We are looking to incinerate approx. 1 to 2 tons of biomedical waste per day using LPG for heating.  Please send me all general information and quotes for machines of all ranges that could meet our needs.  Also, please include emissions reports of all of the various machines that could be of interest to us especially with regards to  dioxins and furals as well as lists of recommendations from past clients.  If you have any government entities using your machines please include lists of whom they are as well as any documentation that you contain that can prove their use.  Timing is also very important to us with regards of when the machines can arrive to Peru and be up and running. Therefore, it would be appreciated if you could include time frames and the whole process from purchase to installation and maintenance.  Burning Rate:5–120kg/hour Minimum Operating Temperature:850o C(primary combustion) Maximum Operating Temperature:1450 oC(Afterburner chamber) Secondary Burning Capacity:Compulsory Density Insulation:20mm High Refractory Casting:Minimum 65mm Heavy duty refracting lining to withstand:1500 oC Average burn out time :maximum:3 hrs Fuel type:Diesel Fuel Consumption in L/hr:7.5 to 9 Residence time in secondary chamber:2sec Residue ash pot 100kg:Max 3.8kg

PRINCE SALMAN UNIVERSITY HOSPITAL (MINISTRY OF EDUCATION) @ AL KHARJ

 ملاحظة: المخططات المقدمة هي بغرض التسعير وعلى المقاول تقديم مخططات متكاملة  طبقا لتوصيات الشركة المصنعة وبما يلزمها من ملحقات لعمل الوحدات بصورة سليمة، ويتم التنسيق مع الوزارة لتحديد مكان الوحدة بالموقع العام  توريد وتركيب واختبار محرقة نفايات طبيه بسعة 75  كجم / الساعة تعمل بالغاز ( LPG ) كاملة بجميع مشتملاتها وملحقاتها مع المدخنة طبقاً للمواصفات الفنية والشروط الصحية العامة   إنشاء غرفه خاصة بالمحرقة تتسع لثلاث محارق كما فى البند 3-1-1 وملحق بغرفة المحرقة مخزن للنقايات يستوعب نفايات لمدة  سبعة أيام وتكون جميع الانشاءات من الخرسانة المسلحة مع تجهيز مبنى المحرقة والمخزن بجميع أعمال التوصيلات والكهربائية والاضاءة وأنظمة التغذية بالمياه والصرف  تزويد مبنى المحرقة ومستودع النفايات بنظام اطفاء حريق بالرشاشات يعتمد على مصدر المياه من شبكة الموقع العام وكذلك نظام إنذار حريق يحتوى على حساسات للحرارة والدخان ويكون هذا النظام مرتبط مع أنظمة إنذار الحريق بالمستشفى  توريد وتركيب واختبار نظام تهوية جبرية لغرفة المحرقة والمستودع بواسطة مراوح مركزية ROOF TOP EXHAUET FANS مع تزويدها بفلاتر عالية الكفاءة ( HEPA FILTER  تركب على سحب المراوح مع اخذ معدل تغيير الهواء 5 مرات فى الساعة مع مجارى وجربلات الهواء المطلوبة  توريد وتركيب وإختبار وحدة تكييف منفصلة لمستودع النفايات DUCTED SPLIT UNITES وبسعة كافية للمحافظة على درجة الحرارة الداخلية عند 14 درجة مئوية صيفاً وشتاً  توريد وتركيب وإختبار مخزن تبريد من الحوائط المعزولة سابقة التحهيز بداخل غرفة النفايات وبسعة 35 متر مكعب لحفظ النفايات الطبية في درجة حرارة صفر مئوي لحين حرقها شاملة لوحدة التبريد وجميع الملحقات      BIO MEDICAL INCENERATOR  BIO MEDICAL INCENERATOR  PLANT Fabricating, supplying, installing and commissioning including all assosaries such as controling and measuring devices, all civil works as needed either in concrete or masonary as the case may be necessary room stack height etc as per the indicated requirment in the specification. if any thing is left out, the bidder is required to include the same to make the system complete for treating biomedical waste generated in hospital having bed of 250nos. etc. CAPACITY :- 200BEDS. Operation and Maintenance Manual As built Drawing in 3 set hard copy + Soft copy in Cad Testing and Commissioning  Note: The drawings  are provided for the purpose of pricing and the contractor has to provide an integrated drawings in accordance with the manufacturer’s recommendations and with the necessary addendums  to the work of the units properly, and be coordinated with the ministry to locate the unit place in the general site  Supply, installation and testing of medical waste incinerator with a capacity of 75 kg / hr gas (LPG) complete with all accessories and consequently with the chimney in accordance with the technical specifications and conditions of public health  make a room for the incinerator that  accommodate three incinerators as in item 3.1.1 and attached to the  incinerator room   waste store that accommodate waste for a period of seven days and all the constructions of reinforced concrete with  preparingg  incinerator building  and store with all the work of wiring, electrical and lighting systems, water supply and sanitation   supply incinerator building and the waste warehouse with   a fire extinguish sprinkler system depends on the source of the water from network of teh general site , as well as a fire alarm system contains sensors for heat, smoke and  this system is linked with the hospital fire alarm systems  Supply, installation and testing of the ventilation system of the  incinerator room and the warehouse with  fans ROOF TOP EXHAUET FANS providing them with filters with high efficiency (HEPA FILTER ride to pull fans with taking the air change rate of 5 times per hour with streams and air required grilles    Supply, installation, testing separate conditioning unit for  waste repository DUCTED SPLIT UNITES and capacity sufficient to maintain the internal temperature at 14 degrees Celsius in summer and winter   Supply, installation, testing  of the cooling store of  insulated  prefabricated walls   inside the waste  room with a capacity of   35 cubic meters to save the medical waste at a temperature of zero Celsius till  burning  including the  cooling unit and all accessories 

PRINCE SALMAN UNIVERSITY HOSPITAL (MINISTRY OF EDUCATION) @ AL KHARJ

 ملاحظة: المخططات المقدمة هي بغرض التسعير وعلى المقاول تقديم مخططات متكاملة  طبقا لتوصيات الشركة المصنعة وبما يلزمها من ملحقات لعمل الوحدات بصورة سليمة، ويتم التنسيق مع الوزارة لتحديد مكان الوحدة بالموقع العام  توريد وتركيب واختبار محرقة نفايات طبيه بسعة 75  كجم / الساعة تعمل بالغاز ( LPG ) كاملة بجميع مشتملاتها وملحقاتها مع المدخنة طبقاً للمواصفات الفنية والشروط الصحية العامة   إنشاء غرفه خاصة بالمحرقة تتسع لثلاث محارق كما فى البند 3-1-1 وملحق بغرفة المحرقة مخزن للنقايات يستوعب نفايات لمدة  سبعة أيام وتكون جميع الانشاءات من الخرسانة المسلحة مع تجهيز مبنى المحرقة والمخزن بجميع أعمال التوصيلات والكهربائية والاضاءة وأنظمة التغذية بالمياه والصرف  تزويد مبنى المحرقة ومستودع النفايات بنظام اطفاء حريق بالرشاشات يعتمد على مصدر المياه من شبكة الموقع العام وكذلك نظام إنذار حريق يحتوى على حساسات للحرارة والدخان ويكون هذا النظام مرتبط مع أنظمة إنذار الحريق بالمستشفى  توريد وتركيب واختبار نظام تهوية جبرية لغرفة المحرقة والمستودع بواسطة مراوح مركزية ROOF TOP EXHAUET FANS مع تزويدها بفلاتر عالية الكفاءة ( HEPA FILTER  تركب على سحب المراوح مع اخذ معدل تغيير الهواء 5 مرات فى الساعة مع مجارى وجربلات الهواء المطلوبة  توريد وتركيب وإختبار وحدة تكييف منفصلة لمستودع النفايات DUCTED SPLIT UNITES وبسعة كافية للمحافظة على درجة الحرارة الداخلية عند 14 درجة مئوية صيفاً وشتاً  توريد وتركيب وإختبار مخزن تبريد من الحوائط المعزولة سابقة التحهيز بداخل غرفة النفايات وبسعة 35 متر مكعب لحفظ النفايات الطبية في درجة حرارة صفر مئوي لحين حرقها شاملة لوحدة التبريد وجميع الملحقات      BIO MEDICAL INCENERATOR  BIO MEDICAL INCENERATOR  PLANT Fabricating, supplying, installing and commissioning including all assosaries such as controling and measuring devices, all civil works as needed either in concrete or masonary as the case may be necessary room stack height etc as per the indicated requirment in the specification. if any thing is left out, the bidder is required to include the same to make the system complete for treating biomedical waste generated in hospital having bed of 250nos. etc. CAPACITY :- 200BEDS. Operation and Maintenance Manual As built Drawing in 3 set hard copy + Soft copy in Cad Testing and Commissioning  Note: The drawings  are provided for the purpose of pricing and the contractor has to provide an integrated drawings in accordance with the manufacturer’s recommendations and with the necessary addendums  to the work of the units properly, and be coordinated with the ministry to locate the unit place in the general site  Supply, installation and testing of medical waste incinerator with a capacity of 75 kg / hr gas (LPG) complete with all accessories and consequently with the chimney in accordance with the technical specifications and conditions of public health  make a room for the incinerator that  accommodate three incinerators as in item 3.1.1 and attached to the  incinerator room   waste store that accommodate waste for a period of seven days and all the constructions of reinforced concrete with  preparingg  incinerator building  and store with all the work of wiring, electrical and lighting systems, water supply and sanitation   supply incinerator building and the waste warehouse with   a fire extinguish sprinkler system depends on the source of the water from network of teh general site , as well as a fire alarm system contains sensors for heat, smoke and  this system is linked with the hospital fire alarm systems  Supply, installation and testing of the ventilation system of the  incinerator room and the warehouse with  fans ROOF TOP EXHAUET FANS providing them with filters with high efficiency (HEPA FILTER ride to pull fans with taking the air change rate of 5 times per hour with streams and air required grilles    Supply, installation, testing separate conditioning unit for  waste repository DUCTED SPLIT UNITES and capacity sufficient to maintain the internal temperature at 14 degrees Celsius in summer and winter   Supply, installation, testing  of the cooling store of  insulated  prefabricated walls   inside the waste  room with a capacity of   35 cubic meters to save the medical waste at a temperature of zero Celsius till  burning  including the  cooling unit and all accessories 

Mobile Diesel Fired Incinerator in container

Mobile Diesel Fired  Incinerator in container,  supplied with the following specifications: complete with constant ventilation fans for extraction,  factory installed inside one 20ft ISO container complete with lighting, ventilation fan, fire security, 3 access doors, and a 1200 litre fuel tank complete with a piping.  Fully containerised mobile  waste management solution for medical, animal, and industrial waste applications. Installed in Container (ISO) : 20” or its nearest equivalent model “ Tender Technical Specification Destruction rate of 50kg/hr Hot Hearth Principle Refractory insulation: a. Silicon carbide floor b. Minimum 22mm insulation thickness c. Brick lined Refractory insulation d. Three layers of refractory insulation e. Temperature Rating 1650 deg.C f. 42% alumina fire bricks Primary Chamber: a. 120Kw Burner  b. Dedicated independent fan system, damper controlled.  c. Thermostatic Sensor  d. Dimensions – 700mm x 700mm x g00mm e. Square Chamber with curved floor for liquid centralization Hot Hearth Chamber: a. 120Kw Burner b. Thermostatic Sensor  c. Minimum Temperature of 1100 deg.C as per WHO guidelines.  d. Two second retention time – Proven with CFD modeling. Steel Construction: a. constructed from 8mm & 1Omm steer plate  b. Painted two pack paint system, red with black flashing Control Panels: a. Door dimensions 700mm x 700mm b. Front mounted ash collection box. Control Panels: a. AiController b. Plug and play  c. Threezone monitoring of: i)Primary chamber               ii) Secondary chamber               iii) Hot hearth d. Digital display e. Burner on-off indication lights  f. Timer Chimney: a. Mild steel painted red b. Refractory insulated with 50mm of insulation. Unit Dimensions: 1840mm x 1 ‘1 50mm x 1950mm high. Safety: a. Burner door cut-off switches b. Fire valve fitted to fuel system  c. Maximum noise at 1m x g0 decibels  d. Exterior temperature 70 deg.C Max

Mobile Diesel Fired Incinerator in container

Mobile Diesel Fired  Incinerator in container,  supplied with the following specifications: complete with constant ventilation fans for extraction,  factory installed inside one 20ft ISO container complete with lighting, ventilation fan, fire security, 3 access doors, and a 1200 litre fuel tank complete with a piping.  Fully containerised mobile  waste management solution for medical, animal, and industrial waste applications. Installed in Container (ISO) : 20” or its nearest equivalent model “ Tender Technical Specification Destruction rate of 50kg/hr Hot Hearth Principle Refractory insulation: a. Silicon carbide floor b. Minimum 22mm insulation thickness c. Brick lined Refractory insulation d. Three layers of refractory insulation e. Temperature Rating 1650 deg.C f. 42% alumina fire bricks Primary Chamber: a. 120Kw Burner  b. Dedicated independent fan system, damper controlled.  c. Thermostatic Sensor  d. Dimensions – 700mm x 700mm x g00mm e. Square Chamber with curved floor for liquid centralization Hot Hearth Chamber: a. 120Kw Burner b. Thermostatic Sensor  c. Minimum Temperature of 1100 deg.C as per WHO guidelines.  d. Two second retention time – Proven with CFD modeling. Steel Construction: a. constructed from 8mm & 1Omm steer plate  b. Painted two pack paint system, red with black flashing Control Panels: a. Door dimensions 700mm x 700mm b. Front mounted ash collection box. Control Panels: a. AiController b. Plug and play  c. Threezone monitoring of: i)Primary chamber               ii) Secondary chamber               iii) Hot hearth d. Digital display e. Burner on-off indication lights  f. Timer Chimney: a. Mild steel painted red b. Refractory insulated with 50mm of insulation. Unit Dimensions: 1840mm x 1 ‘1 50mm x 1950mm high. Safety: a. Burner door cut-off switches b. Fire valve fitted to fuel system  c. Maximum noise at 1m x g0 decibels  d. Exterior temperature 70 deg.C Max

Norfolk incinerator bill wrangle could continue until after Christmas

Norfolk County Council voted by 48 votes to 30 to complete the contract to the proposed incinerator at Saddlebow at an extraordinary meeting in April. Council officers had stated that, due to delays in securing planning permission, the controversial project no longer provided good value for money, and councillors agreed to ditch it. That included…
Read more

Pig corpses / stray dogs and larger animal carcasses

Pig corpses / stray dogs and larger animal carcasses – Load capacity in the range of up to 300 kg / Burn rate approx. 50 kg per hour Temperature Controlled Burner. Incinerators to be designed to meet the Norms of Pollution Control. Technology: Heavy-duty casing, to be a quality, rugged, reliable, economical Incinerator with relevant control, easy to operate and self-contained. Units to be pre-assembled, pre-piped, pre-wired & tested before Transport / Export The supply will comprise the special equipment for effective medical / clinical waste management as mentioned above for a new private environment management company with operations in West and East Malaysia; Indonesia and Thailand to carry out those professional services in order to comply with the safe disposal requirements for clinical and medical waste in the region and to meet the higher technical standard in this particular field. 1.Burning rate: 250 Kg/hr.  2.It should be able to Operate not Less than 10 hours/day 3.This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics, laboratories, institutes, etc…  4.Design Specification: Types A, B, C, D, and E of medical waste 5.“PYROLYTIC” combustion, by controlling the gasification of waste.  6.The incinerator must avoid the release of black smoke and fine dust, (Smokeless) during the loadings. 7.It should be able to reduce the volume of wastes by 98%. 8.It should be able to hold emission in the second burn with gas residence of not less than 2 seconds.  The incineration should be completely free from visible smoke as well as offensive odours.  9. The lower calorific power (L.C.P) of this waste will be 3,500 kcal/kg  The Temperatures of combustion: Minimum will be 850oC and max 1400oC Post combustion: >1100oC. 10. The Internal diameter of the Chimney: Ø 400mm² and its height: 8 Meter   11. The Volume of the combustion chamber: Not Less Than 2.3 M³  12. Burner operation should be Automatic On/Off 13. Fuel : diesel, LPG, Natural Gas, Bio fuel 14. The supplier must provide  necessary information for the best of  the installation 

Pig corpses / stray dogs and larger animal carcasses

Pig corpses / stray dogs and larger animal carcasses – Load capacity in the range of up to 300 kg / Burn rate approx. 50 kg per hour Temperature Controlled Burner. Incinerators to be designed to meet the Norms of Pollution Control. Technology: Heavy-duty casing, to be a quality, rugged, reliable, economical Incinerator with relevant control, easy to operate and self-contained. Units to be pre-assembled, pre-piped, pre-wired & tested before Transport / Export The supply will comprise the special equipment for effective medical / clinical waste management as mentioned above for a new private environment management company with operations in West and East Malaysia; Indonesia and Thailand to carry out those professional services in order to comply with the safe disposal requirements for clinical and medical waste in the region and to meet the higher technical standard in this particular field. 1.Burning rate: 250 Kg/hr.  2.It should be able to Operate not Less than 10 hours/day 3.This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics, laboratories, institutes, etc…  4.Design Specification: Types A, B, C, D, and E of medical waste 5.“PYROLYTIC” combustion, by controlling the gasification of waste.  6.The incinerator must avoid the release of black smoke and fine dust, (Smokeless) during the loadings. 7.It should be able to reduce the volume of wastes by 98%. 8.It should be able to hold emission in the second burn with gas residence of not less than 2 seconds.  The incineration should be completely free from visible smoke as well as offensive odours.  9. The lower calorific power (L.C.P) of this waste will be 3,500 kcal/kg  The Temperatures of combustion: Minimum will be 850oC and max 1400oC Post combustion: >1100oC. 10. The Internal diameter of the Chimney: Ø 400mm² and its height: 8 Meter   11. The Volume of the combustion chamber: Not Less Than 2.3 M³  12. Burner operation should be Automatic On/Off 13. Fuel : diesel, LPG, Natural Gas, Bio fuel 14. The supplier must provide  necessary information for the best of  the installation 

Design standard Multiple chamber incinerator

Waste type organics domestical  waste Calorific value of waste 9,25 MJ/kg Ash content 20.80 % Density 291 Kg/m3 Waste quantity (kg per hr) 12,500 Total Heat input (Gcal/hr) 23.71 organics domestical  waste Solid Domestic waste, after separating the recyclable, such as: plastic, cloth, metal, paper, wood, glass, stones, etc. than larger 10 cms Design standard Multiple chamber incinerator to the design of EPA  standards, Air pollution control Description of the Chimney Top mounted, self supporting Incinerator performance 150kg/hr Refuse  Hospital waste and carcasses Recommended Temperatures Minimum 1000⁰C Dimensions: Length  Width  Height  Extra width for burners At least 3000mm Loading door opening Minimum 700mm x 600mm Hearth area 5.00square meters Description or grate/hearth A full hearth supplied to prevent contaminated liquids from flowing into the ash pit without being incinerated Primary chamber volume At least 3 cubic meters Mixing chamber volume At least 1 cubic meters Settling chamber volume At least 3 cubic meters Weight excluding chimney 15, 000kg at manufacture Firing tools supplied Hoe, Poker and rake

Design standard Multiple chamber incinerator

Waste type organics domestical  waste Calorific value of waste 9,25 MJ/kg Ash content 20.80 % Density 291 Kg/m3 Waste quantity (kg per hr) 12,500 Total Heat input (Gcal/hr) 23.71 organics domestical  waste Solid Domestic waste, after separating the recyclable, such as: plastic, cloth, metal, paper, wood, glass, stones, etc. than larger 10 cms Design standard Multiple chamber incinerator to the design of EPA  standards, Air pollution control Description of the Chimney Top mounted, self supporting Incinerator performance 150kg/hr Refuse  Hospital waste and carcasses Recommended Temperatures Minimum 1000⁰C Dimensions: Length  Width  Height  Extra width for burners At least 3000mm Loading door opening Minimum 700mm x 600mm Hearth area 5.00square meters Description or grate/hearth A full hearth supplied to prevent contaminated liquids from flowing into the ash pit without being incinerated Primary chamber volume At least 3 cubic meters Mixing chamber volume At least 1 cubic meters Settling chamber volume At least 3 cubic meters Weight excluding chimney 15, 000kg at manufacture Firing tools supplied Hoe, Poker and rake

Fenshaolu.com