Nanjing,China
+86-13813931455(WhatsApp)

Tag: operation

HICLOVER Solution for Fighting COVID-19, with ISO9001/CE Certification.

hot medical waste disposing machine, Operation Condition: 8-16 hr/ day

hot medical waste disposing machine, Operation Condition: 8-16 hr/ day  Control: Built-in data recording Operating temperature: Incinerator  /Primary Combustion Chamber Primary Chamber: 900 – 1200 0C Type: horizontal/vertical Temperature:  1200- 1300 oC Residence time of gases : >2 seconds Ash Residue: <5% of original waste size Ash Handling System: Both Automatic and manual removal of Ash. Must ensure removal/treatment of hazardous remnants of ash Flue gas treatment   system : Capable of treating the flow of flue  gas as the incinerator is operating at its maximum capacity Auxiliary device: Water level gauge, pressure sensor, PH sensor..etc  Auxiliary device: Fuel cut-off device Waste  feeding mechanism: Automatic pneumatic/hydraulic waste loading system or conveyor belt , capacity 650-800 L at a time                                                                                                                                       Chimney (Stack): Type: Vertical type height:>7 meter’ Material: Fireproof cast, stainless steel OUTPUT:  GAS- SMOKELESS,ODORLESS  ASH -Max <5% of original waste size Reduction of Pollutant gas SO2, HCL, HF and line particulate Emission standard: WHO/ European Test report for emission testing provided? Heat exchange mode: Automatic Type: Constant loading, Top LoadingCapacity/Burn Speed per hour: 250 -300 kg/hr Substance:External- 3 layers Internal lining:  a fire proof material of pre-fired refractory bricks Using Aluminium lining, resistant to corrosive Gas or Waste and Also to thermal shockSecondary Combustion Chamber:

hot medical waste disposing machine, Operation Condition: 8-16 hr/ day

hot medical waste disposing machine, Operation Condition: 8-16 hr/ day  Control: Built-in data recording Operating temperature: Incinerator  /Primary Combustion Chamber Primary Chamber: 900 – 1200 0C Type: horizontal/vertical Temperature:  1200- 1300 oC Residence time of gases : >2 seconds Ash Residue: <5% of original waste size Ash Handling System: Both Automatic and manual removal of Ash. Must ensure removal/treatment of hazardous remnants of ash Flue gas treatment   system : Capable of treating the flow of flue  gas as the incinerator is operating at its maximum capacity Auxiliary device: Water level gauge, pressure sensor, PH sensor..etc  Auxiliary device: Fuel cut-off device Waste  feeding mechanism: Automatic pneumatic/hydraulic waste loading system or conveyor belt , capacity 650-800 L at a time                                                                                                                                       Chimney (Stack): Type: Vertical type height:>7 meter’ Material: Fireproof cast, stainless steel OUTPUT:  GAS- SMOKELESS,ODORLESS  ASH -Max <5% of original waste size Reduction of Pollutant gas SO2, HCL, HF and line particulate Emission standard: WHO/ European Test report for emission testing provided? Heat exchange mode: Automatic Type: Constant loading, Top LoadingCapacity/Burn rate per hour: 250 -300 kg/hr Substance:External- 3 layers Internal Liner:  a fire proof material of pre-fired refractory bricks Using Aluminium Liner resistant to corrosive Gas or Waste and Also to thermal shockSecondary Combustion Chamber:

a complete destruction of waste from various hospital services

Medical Waste Incinerator Purpose For a complete destruction of waste from various hospital services by heat treatment of high temperature in accordance with EU standard on emission requirement. -Waste from health care activities -Infections waste, laboratory cultures, waste form operation room isolations material in contact with infected patients, waste potentially being infected by pathogenic agents.  -Pathological waste, human fragments, blood, fetus, all body fluids, human tissues. -Sculpts, needles, infusion sets, blades, glass -Pharmaceutical waste.  -Chemical waste laboratory reagents, disinfectants -Expired drugs.  -Low radiation radioactive element. Medical waste incinerator: – Ecological Requirement – No odor -No fume -Definitive treatment of waste Medical waste incinerator: – Manufacturing Standards  -UL,CE, ASME, ISA EURO emission standard  1.Medical waste incinerator  Construction – CS plate shells, FB reinforcement, cast refractory linings,                          Insulation and 14 gage aluminum jacket.  Type of fuel – Oil fired (Diesel) Burning Capacity – 250kg/hr and moisture up to 80%. Duration -8-16/Continuous   Average fuel consumption – Very little as much as possible Control Type – PLC based operation Operating Temperature – Primary chamber 800oc ± 50                                      – Secondary Chamber 1050oc ± 50 Size of incinerator – Not more than 15mx7.20m Chimney – Ø630x25meter height  and 7mm thick CS. Combustion efficiency- 99% Mode of waste handling- Semi-automatic via ram loader. Mode of ash handling – Semi-automatic via grate and ash trolley. Pollution control equipment- Dry settlement zone Doors- 1-waste charging door in primary chamber             1-clinker door in primary chamber             1-ash trolley access door in primary chamber             1-clean out door in secondary chamber Burner – 2- ignition burner in primary chamber                2- after burner in secondary chamber.             Type- package mono block-fully automatic Type of burner operation- modulation control Forced draught fan- 1-primary air fan                                 1-secondary air fan               Fuel storage tank – Capacity- 2500liter above ground                              – Material-6mm thick mild steel                              – 2-diesel pump, gate valve, safety valve, strainer                                 Pipe, pressure gage, check valve, control board                                 Level indicator. Etc Refractory/insulation thickness- not less than 225mm Ram loader capacity- 0.75m3 Electrical supply- 380v/3ph/50 Hz Finish and painting type- powder coated  Audio/ visual alarm system- burner lockout, overload fault  Electrical accessories- primary and secondary chamber temperature …
Read more

a complete destruction of waste from various hospital services

Medical Waste Incinerator Purpose For a complete destruction of waste from various hospital services by heat treatment of high temperature in accordance with EU standard on emission requirement. -Waste from health care activities -Infections waste, laboratory cultures, waste form operation room isolations material in contact with infected patients, waste potentially being infected by pathogenic agents.  -Pathological waste, human fragments, blood, fetus, all body fluids, human tissues. -Sculpts, needles, infusion sets, blades, glass -Pharmaceutical waste.  -Chemical waste laboratory reagents, disinfectants -Expired drugs.  -Low radiation radioactive element. Medical waste incinerator: – Ecological Requirement – No odor -No fume -Definitive treatment of waste Medical waste incinerator: – Manufacturing Standards  -UL,CE, ASME, ISA EURO emission standard  1.Medical waste incinerator  Construction – CS plate shells, FB reinforcement, cast refractory linings,                          Insulation and 14 gage aluminum jacket.  Type of fuel – Oil fired (Diesel) Burning Capacity – 250kg/hr and moisture up to 80%. Duration -8-16/Continuous   Average fuel consumption – Very little as much as possible Control Type – PLC based operation Operating Temperature – Primary chamber 800oc ± 50                                      – Secondary Chamber 1050oc ± 50 Size of incinerator – Not more than 15mx7.20m Chimney – Ø630x25meter height  and 7mm thick CS. Combustion efficiency- 99% Mode of waste handling- Semi-automatic via ram loader. Mode of ash handling – Semi-automatic via grate and ash trolley. Pollution control equipment- Dry settlement zone Doors- 1-waste charging door in primary chamber             1-clinker door in primary chamber             1-ash trolley access door in primary chamber             1-clean out door in secondary chamber Burner – 2- ignition burner in primary chamber                2- after burner in secondary chamber.             Type- package mono block-fully automatic Type of burner operation- modulation control Forced draught fan- 1-primary air fan                                 1-secondary air fan               Fuel storage tank – Capacity- 2500liter above ground                              – Material-6mm thick mild steel                              – 2-diesel pump, gate valve, safety valve, strainer                                 Pipe, pressure gage, check valve, control board                                 Level indicator. Etc Refractory/insulation thickness- not less than 225mm Ram loader capacity- 0.75m3 Electrical supply- 380v/3ph/50 Hz Finish and painting type- powder coated  Audio/ visual alarm system- burner lockout, overload fault  Electrical accessories- primary and secondary chamber temperature …
Read more

Incinerator Operating period Anticipated daily period 8 hours

Operating period Anticipated daily period 8 hours Maximum operating period 12hours Chamber Should be refractory lined to the following standards, hearth and lower section of chamber walls. Hot face materials Super dusty firebricks Limiting continuous service limit 1500°c Thickness 100mm Thermal conductivity 1.3W/mk Insulation Calcium silicate Limiting continuous service limit 1000°c Thickness 25mm Thermal conductivity 0.095w/mk Chimney/stack Should be manufactured from refractory lined mild steel or high quality air cooled stainless steel. The chimney/stack should have a minimum height of 10 meters above ground level Ignition burners Fully packed oil type complete with electric ignition and flame failure controls wired with continuous running fan and complete with all valves, fan and motor Maximum rating :               at least 450kw/hour Burner:                                  arranged for on/off operation Maximum consumption :   at least 6litres per hour Average consumption :      at least 3litres/hour After burner Fully packed oil type complete with electric ignition and flame failure controls wired with continuous running fan and complete with all valves fan and motor. Maximum rating :     At least 450kw/hour Burner:                        arranged for on/off operation Maximum consumption:     at least 9 litres/hour Average consumption:         at least 4.5 litres /hour Flue gas treatment Should have particulate remover (scrubbers) Electrical supply Single phase 220/240v a.c,50/60hz Documentation Operation manual   2 sets Service /maintenance manual 2 sets

Incinerator Operating period Anticipated daily period 8 hours

Operating period Anticipated daily period 8 hours Maximum operating period 12hours Chamber Should be refractory lined to the following standards, hearth and lower section of chamber walls. Hot face materials Super dusty firebricks Limiting continuous service limit 1500°c Thickness 100mm Thermal conductivity 1.3W/mk Insulation Calcium silicate Limiting continuous service limit 1000°c Thickness 25mm Thermal conductivity 0.095w/mk Chimney/stack Should be manufactured from refractory lined mild steel or high quality air cooled stainless steel. The chimney/stack should have a minimum height of 10 meters above ground level Ignition burners Fully packed oil type complete with electric ignition and flame failure controls wired with continuous running fan and complete with all valves, fan and motor Maximum rating :               at least 450kw/hour Burner:                                  arranged for on/off operation Maximum consumption :   at least 6litres per hour Average consumption :      at least 3litres/hour After burner Fully packed oil type complete with electric ignition and flame failure controls wired with continuous running fan and complete with all valves fan and motor. Maximum rating :     At least 450kw/hour Burner:                        arranged for on/off operation Maximum consumption:     at least 9 litres/hour Average consumption:         at least 4.5 litres /hour Flue gas treatment Should have particulate remover (scrubbers) Electrical supply Single phase 220/240v a.c,50/60hz Documentation Operation manual   2 sets Service /maintenance manual 2 sets

Medical Incinerator Specification

Capacity Not less than 500Kg/hr. Operation 24hr-7days/week continuous operation. Combustion chamber 2 combustion chamber. Temp. First combustion chamber 800-1000 C. Secandry combustion chamber 1000-1200 C, with the possibility to be upgraded to 1400 C. Combustion Efficiency 99.99% Retention time Of the flow gases not less than 2 Sec in the hot portion. Excess Oxygen concentration Of primary combustion chamber 3-6% max. Refractory The chambers should be lined with high thermal insulating refractory bricks with suitable thickness and with highly temp.  resistance. Not less than 1400 C for the first combustion chamber, and not less than 1600 C for the secandry combustion chamber, and at the  same time prevent the Temp. of the outside body of the chamber not higher than 70 C. Doors Should be lined with the same bricks, and the edges lined with special suitable insulating material to prevent any gas escaping, and  the doors should be kept under negative pressure during the operation. Air Emission Control System With high destruction and removal efficiency (DRE). Not less than 99.9999 as per KEPA. Wet System If the system equiped with a CEMS washing the flow gas with water, then it should be manufactured from suitable anti  corrossion materials, and equiped with pH meter to measure and neutralize the water. It should be able to use the water in closed recycled  circuit many times before treating/ discharging into the sewage system in compliance with KEPARS. Chemical dosing It should be equiped with suitable autochemical dosing system to control the pH for the water of the wet scrubber system  including sensors. Chimney It should be suitable with the capacity and the technical specifications, with height not less than 12m from ground level. With easy  opennable sampling point equal about 3 inch, and the optimum sampling locations is at least 8D downstream direction and 2D upstream from any  flow disturbancies. Sampling point Should be equiped with a platform located down the sampling point by a distance not less than 1 m, and equiped with suitable  stairs from ground to the port with comfortable slope. Ash Removal It should be auto ash removal system. Fuel It should be dual system, such as diesel and natural gas. Feeding System Should be auto feeding system into primary chamber. Control Room Should be equiped with a control panel shows Temp. of the combustion burners, gas monitoring, digital Temp. indecation for the  primary/secondary chambers, digital Temp. indication for the gases…etc. it should be also Auto operation, burnures on/off auto lamps switch,  auto start/stop for air emission control system, auto gas continuous monitoring system reading and print out of gas emission parameters…etc. Cooling System The primary chamber should be provided with auto cooling systemthrough nozzles to permit direct cooling if the Temp. will be  heigher than 1100 C. Inter-lock system The incinerator should be equiped with inter-lock system to prevent feeding the waste to the primary chamber if the  combustion Temp. less than 500 C. Flue treatment and cleaning…
Read more

Medical Incinerator Specification

Capacity Not less than 500Kg/hr. Operation 24hr-7days/week continuous operation. Combustion chamber 2 combustion chamber. Temp. First combustion chamber 800-1000 C. Secandry combustion chamber 1000-1200 C, with the possibility to be upgraded to 1400 C. Combustion Efficiency 99.99% Retention time Of the flow gases not less than 2 Sec in the hot portion. Excess Oxygen concentration Of primary combustion chamber 3-6% max. Refractory The chambers should be lined with high thermal insulating refractory bricks with suitable thickness and with highly temp.  resistance. Not less than 1400 C for the first combustion chamber, and not less than 1600 C for the secandry combustion chamber, and at the  same time prevent the Temp. of the outside body of the chamber not higher than 70 C. Doors Should be lined with the same bricks, and the edges lined with special suitable insulating material to prevent any gas escaping, and  the doors should be kept under negative pressure during the operation. Air Emission Control System With high destruction and removal efficiency (DRE). Not less than 99.9999 as per KEPA. Wet System If the system equiped with a CEMS washing the flow gas with water, then it should be manufactured from suitable anti  corrossion materials, and equiped with pH meter to measure and neutralize the water. It should be able to use the water in closed recycled  circuit many times before treating/ discharging into the sewage system in compliance with KEPARS. Chemical dosing It should be equiped with suitable autochemical dosing system to control the pH for the water of the wet scrubber system  including sensors. Chimney It should be suitable with the capacity and the technical specifications, with height not less than 12m from ground level. With easy  opennable sampling point equal about 3 inch, and the optimum sampling locations is at least 8D downstream direction and 2D upstream from any  flow disturbancies. Sampling point Should be equiped with a platform located down the sampling point by a distance not less than 1 m, and equiped with suitable  stairs from ground to the port with comfortable slope. Ash Removal It should be auto ash removal system. Fuel It should be dual system, such as diesel and natural gas. Feeding System Should be auto feeding system into primary chamber. Control Room Should be equiped with a control panel shows Temp. of the combustion burners, gas monitoring, digital Temp. indecation for the  primary/secondary chambers, digital Temp. indication for the gases…etc. it should be also Auto operation, burnures on/off auto lamps switch,  auto start/stop for air emission control system, auto gas continuous monitoring system reading and print out of gas emission parameters…etc. Cooling System The primary chamber should be provided with auto cooling systemthrough nozzles to permit direct cooling if the Temp. will be  heigher than 1100 C. Inter-lock system The incinerator should be equiped with inter-lock system to prevent feeding the waste to the primary chamber if the  combustion Temp. less than 500 C. Flue treatment and cleaning…
Read more

hot medical waste disposing machine, Operation Condition: 8-16 hr/ day

hot medical waste disposing machine, Operation Condition: 8-16 hr/ day  Control: Built-in data recording Operating temperature: Incinerator  /Primary Combustion Chamber Primary Chamber: 900 – 1200 0C Type: continuous loading, Top Loading Capacity/Burn rate per hour: 250 -300 kg/hr  Material: External- 3 layers  Internal lining:  a fire proof material of pre-fired refractory bricks with Aluminium lining, resistant to corrosive waste or gas and to thermal shock Secondary  Combustion  Chamber: Type: horizontal/vertical Temperature:  1200- 1300 oC Residence time of gases : >2 seconds Ash Residue: <5% of original waste size Ash Handling System: Both Automatic and manual removal of Ash. Must ensure removal/treatment of hazardous remnants of ash Flue gas treatment   system : Capable of treating the flow of flue  gas as the incinerator is operating at its maximum capacity Auxiliary device: Water level gauge, pressure sensor, PH sensor..etc  Auxiliary device: Fuel cut-off device Waste  feeding mechanism: Automatic pneumatic/hydraulic waste loading system or conveyor belt , capacity 650-800 L at a time                                                                                                                                       Chimney (Stack): Type: Vertical type height:>7 meter’ Material: Fireproof cast, stainless steel OUTPUT:  GAS- SMOKELESS,ODORLESS  ASH -Max <5% of original waste size Reduction of Pollutant gas SO2, HCL, HF and line particulate Emission standard: WHO/ European Test report for emission testing provided? Heat exchange mode: Automatic Accessories:   All standard accessories for incinerator, including but not limited to loading system, heat exchangers, pollution control system, ash removal system, including ladder and oil tanker (2500litre capacity). Operating Environment:  The incinerator is capable to operate at the altitude of 2400mt above sea level. (according to the site conditions) Power Requirement: 220 Vac single phase or 380 Vac three phase 4 wire system  50HZ    Installation Testing and Commissioning :   to be conducted by certified or qualified personnel.   Supplier shall provide the following documentation     User (Operating) manual in English.  Service (Technical / Maintenance) manual in English.  Certificate of calibration and inspection from factory.  Fast moving spare parts: Supplier is able to provide fast moving spare parts with quantities as described in the price schedule or their equivalent.  Training: Supplier is able to provide training on operation, management and maintenance of incinerators.    Warranty  Comprehensive warranty for minimum 2 year.  Maintenance Service during Warranty Period  During warranty period supplier must ensure, corrective/breakdown maintenance whenever required.  Supplier has a local agent or branch office in Ethiopia (please indicate the name and contact details of the agent)  Supplier provides labor, lifting equipment and tools needed for the installation, testing and commissioning of the incinerator. The supplier will be responsible for the safety of its staff, workers and laborers during the installation, testing & commisssioning  Able to provides all necessary information that would be used as an input for preparation of floor (platform) and room for the incinerator to be supplied such as the following;  Lay outs (drawings) and  pictures of the incinerators to be installed …
Read more